Service division
|
SERVICE DIVISION
HPP-26, Mosenergo Ltd.
- Turbine department
photo
- BRCP5 replacement
photo
- Ò-250 turbine bearings repair
- Mounting the fluoroplastic plate at the Ò-250 turbine forward chair-type support
photo
- Remedial maintenance of the condenser ball cleaning system, station number 1
- Exchange of HSH6-2 matrix, station number 6
- Repair of various technological pipelines and steam lines, including measures on reconstruction of HP7 turbine support,
station number 1, including the cylinder cutting off and HP turbine banding reconstruction.
- Boiler department
- The hot-water boiler heating surfaces repair, replacement of collectors, isolation lagging and the boiler walling-up
photo
photo
photo
- Exchange stuffing onto RRAH-98 in boiler, station number 7
- The RRAH-98 general overhaul, station number 6À
- The RRAH air-heaters replacement, block number 6
- Gas fittings inspection examination including the burners repair
photo
photo
- GCP8-2 and GCP-1 reconstruction and gas pipelines mounting including
mounting of fittings according to the new metrological requirements.
photo
photo
HPP-23, Mosenergo Ltd.
- Boiler department
- The RRAH-88 general overhaul at the station number 8 boiler including replacement of a cold and hot layer
stuffing and the RRAH supports replacement
- Repair of RRAHs, stations numbers 5, 6, 7
- Replacement of SO-110 air-heater unit by SP-250 unit at the RRAH-88, station number 5
photo
photo
- Repair of KFBO-10 and SO-110 air-heater installations, including banding and replacement of fittings
- Repair of DOD-31, 5 smoke exhausters
- Repair of VDN-24 ventilating fans
- Repair of various productivity and purposes pumps at boiler and turbine rooms
photo
- Repair of the peak-load hot-water boiler gas facilities subject to the new SRGE9 requirements, stations no.14 and no.15
- Repair, manufacturing and installation gas-air ducts, metal constructions, ladders and platforms for servicing heat-mechanic equipment
- Repair of pipe fittings and pipelines
- sprinkler reinforcing center of main building, engine department;
- reinforcing center and temporary closing-down system of HSH
photo
photo
photo
- GCP-2 overhaul with replacement of the fittings, sound attenuators, flanged connections according to the new metrological requirements
- Installation of a power boiler gas pipeline, station number 8
Standardized works at the boiler in order to inspect the screen pipelines condition.
Thermal expansion compensators installation on various diameter pipelines (up to 1200mm).
photo
photo
Pipes lying on a trestle.
photo
Latches mounting on 600, 800, 1000, and 1200 mm delivery pipelines.
photo
Construction of capacity for keeping following products: by-product-recovery department, black oil, transformer
oil and turbine oil.
photo
The own manufacture spare parts are delivered to HPP-8, HPP-21, HPP-22, HPP-23, HPP-26 stations of Mosenergo Ltd.
and to power stations in other regions of Russia, Poland, Yugoslavia and Estonia.
Erection works are carried out on power stations in Poland and Estonia.
|