ENTEK
The development, applied in working new decisions to energy
The constructing-and-mounting works
17-G building 3, Krasnokazarmennaya Street,
111116 Moscow, Russia
Phone/Fax: (495) 673-03-04, (495) 362-73-70,
E-mail: main@entek.ru
Main Work Patents Partners Kontakts
  • Research engineering activity
  • New valves
  • New exhaust pipes
  • Sliding fluid-flow controllers
  • Heat-exchange work surfaces for RRAH
  • Dynamic power surge limiter
  • Nozzle diaphragms
  • Shield
  • Vortex extinguisher
  • LPT for cogeneration turbines
  • Laser-emission strengthening
  • Service division
  • SERVICE DIVISION

      1. HPP-26, Mosenergo Ltd.

        1. Turbine department photo
          1. BRCP5 replacement photo
          2. Ò-250 turbine bearings repair
          3. Mounting the fluoroplastic plate at the Ò-250 turbine forward chair-type support photo
          4. Remedial maintenance of the condenser ball cleaning system, station number 1
          5. Exchange of HSH6-2 matrix, station number 6
          6. Repair of various technological pipelines and steam lines, including measures on reconstruction of HP7 turbine support, station number 1, including the cylinder cutting off and HP turbine banding reconstruction.
        2. Boiler department
          1. The hot-water boiler heating surfaces repair, replacement of collectors, isolation lagging and the boiler walling-up photo photo photo
          2. Exchange stuffing onto RRAH-98 in boiler, station number 7
          3. The RRAH-98 general overhaul, station number 6À
          4. The RRAH air-heaters replacement, block number 6
          5. Gas fittings inspection examination including the burners repair photo photo
        3. GCP8-2 and GCP-1 reconstruction and gas pipelines mounting including mounting of fittings according to the new metrological requirements. photo photo
      2. HPP-23, Mosenergo Ltd.

        1. Boiler department
          1. The RRAH-88 general overhaul at the station number 8 boiler including replacement of a cold and hot layer stuffing and the RRAH supports replacement
          2. Repair of RRAHs, stations numbers 5, 6, 7
          3. Replacement of SO-110 air-heater unit by SP-250 unit at the RRAH-88, station number 5 photo photo
          4. Repair of KFBO-10 and SO-110 air-heater installations, including banding and replacement of fittings
          5. Repair of DOD-31, 5 smoke exhausters
          6. Repair of VDN-24 ventilating fans
          7. Repair of various productivity and purposes pumps at boiler and turbine rooms photo
          8. Repair of the peak-load hot-water boiler gas facilities subject to the new SRGE9 requirements, stations no.14 and no.15
        2. Repair, manufacturing and installation gas-air ducts, metal constructions, ladders and platforms for servicing heat-mechanic equipment
        3. Repair of pipe fittings and pipelines
          1. sprinkler reinforcing center of main building, engine department;
          2. reinforcing center and temporary closing-down system of HSH photo photo photo
        4. GCP-2 overhaul with replacement of the fittings, sound attenuators, flanged connections according to the new metrological requirements
        5. Installation of a power boiler gas pipeline, station number 8
      3. Standardized works at the boiler in order to inspect the screen pipelines condition.

      4. Thermal expansion compensators installation on various diameter pipelines (up to 1200mm).

        photo photo
      5. Pipes lying on a trestle.

        photo
      6. Latches mounting on 600, 800, 1000, and 1200 mm delivery pipelines.

        photo
      7. Construction of capacity for keeping following products: by-product-recovery department, black oil, transformer oil and turbine oil.

        photo
      8. The own manufacture spare parts are delivered to HPP-8, HPP-21, HPP-22, HPP-23, HPP-26 stations of Mosenergo Ltd. and to power stations in other regions of Russia, Poland, Yugoslavia and Estonia.

      9. Erection works are carried out on power stations in Poland and Estonia.